Tank, Tank Top, Tank Lining, & Launder Replacement

The project required the replacement of the acid tank and cyclone prep tanks, and the tank tops of 5 other corrosive and flammable substance.  Multi hydraulic cranes (250t, 150t, 125t, and 40t) were used for tandem critical lifts and single lifts.  Ultra-high-pressure water cutting was used to prevent fire and or explosions.  Pre-erected scaffold were built and lifted into position to limit job duration and working at heights risks.