Sand Dredge Relocation

Sand Dredge Relocation

Dredge Relocation Project The Dredge Relocation Project, valued at $26M AUD, was a significant part of a mine capacity expansion project which required upgrading equipment and systems on the floating Concentrator to tie-in the new dredge. The dredge project comprised...
Rotary Kiln Refractory Project

Rotary Kiln Refractory Project

Rotary Kiln Refractory Project The project required the demolition and replacement of approx 55% of the 90m x 5m rotary kiln refractory, replacement of shell tubes, and upgrade transimitters.  A ten linear metre section trialled the use of Stud Welding and Shotcrete...
Sizer Screen Replacement Project

Sizer Screen Replacement Project

Sizer Screen Replacement Project The Mogensen Screen replacement required “out-of-the-box” brain-storming to analyse and plan the manoeuvring of the 20 year old 800kg mogensen screens out of the building, and to install the replacement screens safely.  Temporary...
Waste Gas Stack Remove, Repair, & Reinstallation Project

Waste Gas Stack Remove, Repair, & Reinstallation Project

Waste Gas Stack Remove, Repair, & Reinstallation Project The Waste Gas Stack project involved the removal of 4 of vertical 11m x 3m fibreglass stack sections to be sent offsite for fibreglass repair of internal delamination’s, then reinstall on return to site. ...
HP Flare Ignition Replacement Project

HP Flare Ignition Replacement Project

HP Flare Ignition Replacement Project The flare ignition replacement project involved the replacement of the flame front ignition control panel, all ignition cable, gas piping and igniter; and the repair  and or replacement of damaged flare heads. Critical to the...