Dredge Relocation Project The Dredge Relocation Project, valued at $26M AUD, was a significant part of a mine capacity expansion project which required upgrading equipment and systems on the floating Concentrator to tie-in the new dredge. The dredge project comprised...
Rotary Kiln Refractory Project The project required the demolition and replacement of approx 55% of the 90m x 5m rotary kiln refractory, replacement of shell tubes, and upgrade transimitters. A ten linear metre section trialled the use of Stud Welding and Shotcrete...
Waste Gas Stack Remove, Repair, & Reinstallation Project The Waste Gas Stack project involved the removal of 4 of vertical 11m x 3m fibreglass stack sections to be sent offsite for fibreglass repair of internal delamination’s, then reinstall on return to site. ...
High Pressure Field & Boundary Block Valve Replacement and Piping Renewal The project involved the replacement of 165 boundary and oil well-head isolation valves in remote Papua New Guinea. The work was a labour intensive activity that involved many physical and...
HP Flare Ignition Replacement Project The flare ignition replacement project involved the replacement of the flame front ignition control panel, all ignition cable, gas piping and igniter; and the repair and or replacement of damaged flare heads. Critical to the...