Sizer Screen Replacement Project

Sizer Screen Replacement Project

Sizer Screen Replacement Project The Mogensen Screen replacement required “out-of-the-box” brain-storming to analyse and plan the manoeuvring of the 20 year old 800kg mogensen screens out of the building, and to install the replacement screens safely.  Temporary...
Waste Gas Stack Remove, Repair, & Reinstallation Project

Waste Gas Stack Remove, Repair, & Reinstallation Project

Waste Gas Stack Remove, Repair, & Reinstallation Project The Waste Gas Stack project involved the removal of 4 of vertical 11m x 3m fibreglass stack sections to be sent offsite for fibreglass repair of internal delamination’s, then reinstall on return to site. ...
HP Flare Ignition Replacement Project

HP Flare Ignition Replacement Project

HP Flare Ignition Replacement Project The flare ignition replacement project involved the replacement of the flame front ignition control panel, all ignition cable, gas piping and igniter; and the repair  and or replacement of damaged flare heads. Critical to the...
Miscellaneous Works

Miscellaneous Works

Miscellaneous Works Miscellaneous work activities to inspect and or replace pressure vessel and tank structure, valves, gaskets and instrumentation.. 15. 4E2308 – LNG GAS COOLER – LNG Cooler Over View 14. 4PSV635 – PSV PROD WATER SKIM TNK PIPING...